Tra Vinh V1-3 nearshore wind project

Location: Duyen Hai, Tra Vinh province Scope of work: Lifting services & Marine services (600T crane barge for pre-installation T1+T2) (from July 2021 to October, 2021) Equipment used:

Hiep Thanh Tra Vinh nearshore wind project

Location:  Bao Hamlet, Hiep Thanh Commune, Duyen Hai Town, Tra Vinh Province.Scope of work:  Construction for O&M jetty,  PHC800/60-70m pile driving (from April 2021 to June, 2021) Total weight: 2,000mdEquipment used: 2000 ton barge with 250 ton crawler crane – 10T/6.2T pile hammer

VPL Ben Tre nearshore wind project

Location:  Thoi Thuan, Binh Dai district, Soc Trang province, VietnamScope of work:  Foundation construction of PHC800/60-70m pile driving (from February 2021 to May 15, 2021) Total weight: 15,000mdEquipment used:1. 3600 ton barge with 200 ton crawler crane – 10T/6.2T pile hammer 2. 9000 ton barge with 250 ton crawler crane – 10T/6.2T pile hammer 3. 1800...

Soc Trang 7 phase 1 nearshore wind project

Scope of work: Construction of PHC800/60-70m/center pile driving (from November 2020 to March, 2021) Total weight: 4,000md Equipment used: 1800 ton barge with 150 ton crawler crane – 10T/6.2T pile hammer

Kosy Bac Lieu wind power project

Receive 09 WTGs GW155 Goldwind 4.5Mw from international ships, transport and load at Long An International Port Marine barge transport (06 WTGs) from Long An international port to site jetty of Hoa Binh district, Bac Lieu province. From December 2020 to September 2021

Hoa Binh 2 nearshore wind project

• Loading 24 sets nacelle components weigh 138T from trucks onto barges transport at Long An port • From June 2021 to August 2021

Sunpro Ben Tre wind power project

• Receive 07 WTGs of Goldwind 4.5Mw components from the ship, load onto trucks, and transport to the yard for storage and preservation at Long An port. • Unload 07 WTGs components from trucks to the yard. • Lift 07 WTGs components from the yard onto trucks and transport to the pier for delivery to barges or ships. • Load 07 WTGs components from trucks onto barges transport or ships. • From July 2021 to April 2022

Thanh Phong wind power project

Receive 09 WTGs Goldwind 3.3Mw components from the ship, load onto trucks, and transport to the yard for storage and preservation at Long An port. Unload 09 WTGs components from trucks to the yard. Lift 09 WTGs components from the yard onto trucks and transport to the pier for delivery to barges or ships. Load 09 WTGs components from trucks onto barges transport or ships. From May 2021 to December 2021

Hoa Dong 2 wind power project

• Receive 22 WTGs components from the ship, load onto trucks, and transport to the yard for storage and preservation at Long An port. • Unload 22 WTGs components from trucks to the yard. • Lift 22 WTGs components from the yard onto trucks and transport to the pier for delivery to barges or ships. • Load 22 WTGs components from trucks onto barges transport or ships. • From December 2020 to September 2021

Ben Tre V1-3 nearshore wind project

Location:   Ba Tri District, Ben Tre Province Investor/EPC General Contractor: SigmaScope of work: Construction of PHC800C pile driving for wind turbine foundation Equipment used  :​ 150T pile driving system (2000T barge, 150T crawler crane, 10T pile driving hammer…) Implementation time: From April 2020 to July 2020