Hoa Binh 1,2 (2 phase) nearshore wind project.

Location: Hoa Binh, Bac Lieu Province, Viet NamScope of work:  Piling works PHC D800/60-70m (From March/2020 to October/2020) Total: 15,000mdEquipment’s Used:

220kV Kien Binh – Phu Quoc offshore line

The 220kV Kien Binh – Phu Quoc line  is the first 220kV cross-sea line in Vietnam and the whole Southeast Asia region with a length of 80.44km. The sea route is 64.7 km long with 117 pillars, each pillar is a giant block of steel and concrete structure. Each steel pillar is a structure 51 –...

Nghi Son Cement Project

Installation by loading outside the wharf with a 150-ton crane barge – Nghi Son Cement Factory project – Thanh Hoa Location:  Tinh Gia district, Thanh Hoa province, VietnamScope of work:  Equipment used:

DKC class oil tanker berthing facilities

Scope of work: • Piling and construction of 5,000 DWT, 50,000 DWT berths and approach bridges. • Total volume: 10,000md PHC and SPP piles D600 & D800 (length 36-48m) • Duaration time: From May 2017 to April 2018 Equipment used: • 2700T barge with 200T crawler crane – 10T/6.2T pile hammer • 2000T barge with 150T crawler crane – 10T/6.2T pile hammer • 2000T barge with 120T crawler crane – 8T/6.2T pile hammer • 250T jackup with 200T crawler crane – 10T/6.2T pile hammer