Hoa Dong 2 wind power project

Location:  Hoa Dong commune, Vinh Chau town, Soc Trang province.

Scope of work: 

  • Receive 22 WTGs components from the ship, load onto trucks, and transport to the yard for storage and preservation at Long An port
  • Unload 22 WTGs components from trucks to the yard.
  • Lift 22 WTGs components from the yard onto trucks and transport to the pier for delivery to barges or ships.
  • Load 22 WTGs components from trucks onto barges transport or ships.
  • From April 2021 to May 2022

Equipment used:

  • Crane from 80T-500T
  • Hydraulic railer 12 axle
  • Lowbed trailer
  • Extendable trailer 12 & 8 axle