Location: Hoa Binh district, Bac Lieu province, Vietnam
Scope of work:
- Receive 09 WTGs GW155 Goldwind 4.5Mw from international ships, transport and load at Long An International Port
- Marine barge transport (06 WTGs) from Long An international port to site jetty of Hoa Binh district, Bac Lieu province.
- From December 2020 to September 2021
Equipment used:
- Crane for unloading/loading from 80T-500T
- Hydraulic railer 12 axle
- Lowbed trailer
- Extendable trailer 12 & 8 axle
- Barge transport 60-76m & Tugboat 450hp-3600Hp








