Kosy Bac Lieu wind power project

Location:  Hoa Binh district, Bac Lieu province, Vietnam
Scope of work: 

  • Receive 09 WTGs GW155 Goldwind 4.5Mw from international ships, transport and load at Long An International Port
  • Marine barge transport (06 WTGs) from Long An international port to site jetty of Hoa Binh district, Bac Lieu province.
  • From December 2020 to September 2021

Equipment used:

  • Crane for unloading/loading from 80T-500T
  • Hydraulic railer 12 axle
  • Lowbed trailer
  • Extendable trailer 12 & 8 axle
  • Barge transport 60-76m & Tugboat 450hp-3600Hp