Thanh Phong wind power project

Location:  Thanh Phu town, Ben Tre province.

Scope of work: 

  • Receive 09 WTGs Goldwind 3.3Mw components from the ship, load onto trucks, and transport to the yard for storage and preservation at Long An port.
  • Unload 09 WTGs components from trucks to the yard.
  • Lift 09 WTGs components from the yard onto trucks and transport to the pier for delivery to barges or ships.
  • Load 09 WTGs components from trucks onto barges transport or ships.
  • From May 2021 to December 2021

Equipment used:

  • Crane from 80T-500T
  • Hydraulic railer 12 axle
  • Lowbed trailer
  • Extendable trailer 12 & 8 axle