Tra Vinh V1-3 nearshore wind project

Location: Duyen Hai, Tra Vinh province

Scope of work: Lifting services & Marine services (600T crane barge for pre-installation T1+T2) (from July 2021 to October, 2021)

Equipment used:

  • Barge 5400T (76m x 24.5m x 4.88m)
  • 1 x 600T Crawler crane
  • 1 x 250T Crawler crane
  • 1 x Tugboat 2400HP
  • 1x AHT tugboat 500Hp
  • 1 x Ballast system pump