Location: Thoi Thuan, Binh Dai district, Soc Trang province, Vietnam
Scope of work:
Foundation construction of PHC800/60-70m pile driving (from February 2021 to May 15, 2021)
Total weight: 15,000md
Equipment used:
1. 3600 ton barge with 200 ton crawler crane – 10T/6.2T pile hammer
2. 9000 ton barge with 250 ton crawler crane – 10T/6.2T pile hammer
3. 1800 ton barge with 150 ton crawler crane – 10T/6.2T pile hammer
4. 3500 ton barge with 250 ton crawler crane – 10T/6.2T pile hammer
5. 5400 ton barge with 150 ton crawler crane – 10T/6.2T pile hammer