VPL Ben Tre nearshore wind project

Location:  Thoi Thuan, Binh Dai district, Soc Trang province, Vietnam
Scope of work: 

Foundation construction of PHC800/60-70m pile driving (from February 2021 to May 15, 2021)

Total weight: 15,000md
Equipment used:
1. 3600 ton barge with 200 ton crawler crane – 10T/6.2T pile hammer

2. 9000 ton barge with 250 ton crawler crane – 10T/6.2T pile hammer

3. 1800 ton barge with 150 ton crawler crane – 10T/6.2T pile hammer

4. 3500 ton barge with 250 ton crawler crane – 10T/6.2T pile hammer

5. 5400 ton barge with 150 ton crawler crane – 10T/6.2T pile hammer