VPL Ben Tre offshore wind farm
Location: Thoi Thuan, Binh Dai dist, Ben Tre Province, Viet Nam
Scope of work:
Piling works PHC D800/60-70m (from March/2021 to May/2021)
total: 15,000md
Equipment’s Used:
1. Barge/crane: 3600 tons (71×18.5m)/200 ton, diesel hammer 10 ton…
- Barge/crane: 9000 tons(100×27.5m)/250 ton, diesel hammer 10 ton…
- Barge/crane: 1800 tons(52x16m)/150 ton, diesel hammer 10 ton…
- Barge/crane: 3500 tons(63x20m)/250 ton, diesel hammer 10 ton…
- Barge/crane: 5400 tons(73×24.5m)/150 ton, diesel hammer 10 ton…